Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the instagram-feed domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klarcabm/www.katzianka-architektur.at/wp-includes/functions.php on line 6114
Salzamt Klagenfurt – Katzianka Architektur

the SALZAMT
Curio Collection by Hilton

the SALZAMT Curio Collection by Hilton

Klagenfurt

AUFTRAGGEBER
LEISTUNGSUMFANG
BAUKOSTEN
JAHR DER UMSETZUNG
TÄTIGKEIT

LHH3 Immobilien GmbH
Planung Architektur
9,5 Mio. EUR
2023 – 2025
Umbau | Hotel

AUFTRAGGEBER

LHH3 Immobilien GmbH

LEISTUNGSUMFANG

Planung Architektur

BAUKOSTEN

9,5 Mio. EUR

JAHR DER UMSETZUNG

2023 – 2025

TÄTIGKEIT

Umbau | Hotel